H1 SEI
hugo.paris@LIGO.ORG - posted 11:34, Wednesday 19 December 2012 (4970)
HAM2-ISI - Final In-CHamber Testing

Transfer functions were measured on HAM2-ISI overnight. They show good concordance with their counterpart at LLO*. 

Linearity test is clean and slopes are within requirements (variation from average <1.5%).


  Slope Offset Average slope Variation from
average(%)
H1 1.82 -3939.89 1.83 -0.37
H2 1.81 -1903.29 -1.05
H3 1.85 -474.80 1.43
V1 1.34 1291.50 1.34 -0.39
V2 1.34 139.11 -0.16
V3 1.35 -993.25 0.55

All other tests are satisfiying. 

SEI is comfortable closing up this chamber too.

 

Note: One should be careful not to touch the cables that make a loop from Stage-0 to Stage-1 when closing up.

* LLO measurements were taken with PR3 on.

Images attached to this report