We pulled the soft cover off the North side of HAM3, and took a series of pictues in the chamber.
These pictures will be used to asses the state of the ISI payload when we measured the ISI transfer functions for the Viton Pads Efficiency Investigation.
Cheryl, Hugo,
The attached .pdf file shows what was installed on HAM3-ISI as of yesterday, which is the configuration we ran the IMC test under. All the small optics mentionend in the top-level drawing are installed here