Finished cleaning H2 PSL table Cleaning at end Y Moved test squeezer table from H1 PSL area to next to HAM 4 and HAM 5. Drilling for anchor bolts behind HAM 12
The H2 PSL table is now clean. Every hole was brushed with a gun bore brush, and then cleaned by using the dust-off cans of compressed air to shoot out any particles while a HEPA vac was over it to collect them. This was made much more difficult by the ugly rust stain that was sitting on the table and required lots of attention. A big thanks to Terry, Christina, and Gerardo Jr for helping with all this!
The springs have been pulled down and the barrel nuts inserted, so the optics table is ready to be installed on the test stand.
Position sensors 30 & 36 were removed after it was found they weren't working correctly.
Throughout the day: cleaning at Mid-Y completed by 12:00 Jodi and crew out by HAM12 Michael Rodruck and Gerardo Jr. cleaning on H2 PSL table 9:30 – M. Landry to EY to lock down GS-13s so initial alignment of BSC can begin 1:30 – Kyle out to X-End to replace a mechanical level gauge for CP8.
I discovered while attempting to replace CP8's magnehelic diff. pressure (mechanical level gauge) gauge that the recent reboot/overpressure episodes had caused a previously unnoticed soft rubber plug to pop out of the back of the gauge. I reinstalled this plug and now the gauge is working normally and won't requre replacement. Obviously, this device is designed to pop out and prevent damage to the measuring diaphram in the event of overpressure.
Delivery from Diamond freight Drilling core holes behind HAM12 Cutting off of bolts from degrouting areas PSL table cleaning Dave attempted to restart h1awg0 Terry, Christina, Gerardo Jr cleaned at mid Y
LDAS have completed their work, so I restarted fb0w writing frames.
The data gap on nds0 is from 12:28 Apr 5 to 15:16 Apr 6. For archived data in this period please use nds2.
The historical quad and BS data was accessible on the workstation at /export/controls/data, but it was physically on the front end, at /home/controls/data . So I first renamed it to olddata20110406, and then copied it across to /ligo/svncommon/ (i.e., right next to the checkout of the SUS SVN at /ligo/svncommon/SusSVN ). Over the next few days I'll do a bit of tidyup on the files, then move them into the SVN and formally add/commit them. Please don't add any new data to either copy of olddata20110406. Rather, put new data directly in the SVN using the links I created: ~/X1QUAD -> /ligo/svncommon/SusSVN/sus/trunk/QUAD/X1 ~/X1BSFM -> /ligo/svncommon/SusSVN/sus/trunk/BSFM/X1 Below those entry points, the directories are for quad number (e.g., QUAD01), build number (e.g., BUILD01), "sensor-actuator group" (e.g., SAGM0). So an actual data file might live at /ligo/svncommon/SusSVN/sus/trunk/QUAD/X1/QUAD01/BUILD01/SAGM0/Data/
- Deliveries from UniFirst, Diamond Freight (for Hugh), and Praxair in the morning. - DaveB and KyleR worked on EX's vacuum EPICS system. - RichardM worked on waking h1awg from its winter hibernation. This led him to working on the GPS receivers as well. - MichaelR, TerryS, ChristinaC, and Jr. were cleaning the H2 PSL table, hole-by-hole. Efforts are now focusing on the holes in the rusted portion of the table. - Apollo folks working around HAM7 area in preparation of linking its new neighboring HAM(8?). - Winds very high today as cold front returns...snow expected Wednesday.
I did a further series of reboots of h0veex today to get more data on the problem of the PID controller opening the CP fill valve too much on startup.
LDAS are doing some upgrades to their fiber channel switch in the LSB, I have stopped fb0w from writing frames since its file system is down for the duration of this work. This means nds0 has no archived data for this period and nds2 should be used instead.
Vented Y-mid after lunch today. GV10 annulus ion pump current ramped up predictably as a result of the known leak between the outer O-ring and the annulus space. Had to valve in aux. pump cart to help GV10 annulus ion pump match leak rate. This signal is on scale at 10mA on local controller but "red" on CDS. This will probably go "green" on CDS over the next day or so. Note: GV10 annulus leak has never shown to communicate to PT-244. Nevertheless we will utilize the aux. pump on this annulus during the aLIGO BSC chamber move/retrofit.
The Met One 227b dust monitors at locations 4, 5, 7 and 9 were moved onto microphone stands at ~21:00 UTC April 5, 2011.
A digest of all open work permits. If your job is complete, feel free to sign it as such. #### - YYYY MMM DD - NAME - DETAILS 2530 - 2010 Aug 17 - Robert - Install infrasound at EX 2566 - 2010 Oct 19 - Dave - Remove H2 channels 2594 - 2010 Nov 01 - EricA - Run HEPI actuator flushing... 2642 - 2010 Dec 17 - Squeezers - Seismic tests on squeezer high legs, craning... 2645 - 2010 Dec 21 - Gerardo - Remove H2 OpLevs 2691 - 2011 Feb 15 - EricA - Pump HEPI fluid from ground to mezanine... 2699 - 2011 Feb 28 - Corey - Swap SEI support stack with aLIGO HEPI... 2719 - 2011 Mar 21 - Kyle - Vent RGA volume and remove RGA components from BSC6... 2725 - 2011 Mar 31 - Kyle - Investigate/correct pressure range drift 2724 - 2011 Mar 31 - Bubba - Welding/grinding outside of warehouse 2726 - 2011 Apr 04 - Jodi - Try propane stove for pressure-cooking Viton 2727 - 2011 Apr 05 - Kyle - Vent BSC6...
I have attached second trends of the .5 micron dust levels in the beer garden alongside the Z axis of the accelerometer installed on HAM6. One is during April 1, 2011 and the other is April 4, 2011. Using the accelerometer as an indication of the time that jack hammering took place, it seems that the initial spike in dust appears a few minutes prior to the beginning of work. This might be attributed to the powering on of the blower. On April 4, 2011, I have indicated the approximate times of when the blower was turned on and off: off at 8:40, on at 10:24 and off at 2:00 PDT.
The horizontal actuator on the NE corner of BSC 7 has been temporarily installed. There is no official procedure for installing these yet so the horizontal actuator is there merely to help size the scaffolding for the BSC. It is now held in place with 3 angle brackets. The plans are to remove the horizontal actuator once the measurements have been taken.
The horizontal actuator installed-dimensions were taken and has now been uninstalled.
The old iLIGO CDS main file server (hanford2) is very slow. I did some diagnostics (error logs, network packet analyser) but could not find any errors. The raid itself is very fast when accessed by hanford2, only NFS clients are slow. I rebooted hanford2 ata 17:11, but that did not work. I killed the conlogger since that was started today, but that was not the cause.
We will have to suffer with a slow file system over the weekend (dont log out or close windows) and I'll take another look on Monday.
Filled well tank. This caused a high level alarm on the well tank, but cleared later in the morning. Filters changed on RO unit Thursday