H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:06, Tuesday 20 February 2024 - last comment - 09:10, Wednesday 21 February 2024(75899)
OPS Day Shift Summary

TITLE: 02/21 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Primary Ongoing Activities

  1. CDS Work is unfinished (facing some delays that started with the last switch they went to in the mechanical room).
  2. HAM8 Vent is done
  3. SQZT work is ongoing

Control Room Log (02/20) so far..

 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:22 SAF LVEA is Laser HAZARD LVEA Yes LVEA is Laser HAZARD 03:59
16:23 VAC Gerardo, Jordan LVEA Yes Vacuum Checkup 16:40
16:46 CDS Fil, Ryan S EX N CDS Work 18:21
16:47 CDS Tony, Jonathan EX N CDS Work 18:21
16:53 CDS Erik Control Rm N Dolphin Fencing EX 17:13
17:01 VAC Jordan, Janos, Gerardo FCES N HAM8 Vent 20:18
17:07 FAC Karen EY N Technical Cleaning 17:55
17:07 VAC Kim EX N Technical Cleaning 17:45
17:29 SQZ Camilla, Vicky FCES N Move SQZT8 Out of the way 18:29
17:44 FAC Kim FCES N Technical Cleaning 18:44
17:45 SQZ Nutsinee, Naoki LVEA Yes SQZT Work 20:15
17:55 EE Marc, Fernando CER Mezzanine N Looking for a temp gun 18:00
18:00 EE Marc H2 Building N Looking for a temp gun 18:03
18:17 FAC Chris FCES N Helping tech clean 21:13
18:21 CDS Tony, Jonathan, Fil, Ryan S, Dave MX, EX N CDS Work 19:28
18:38 SQZ Daniel LVEA Yes SQZ Work 20:15
18:57 EE Marc LVEA Yes Checking on activity 19:17
19:23 FARO Ryan C LVEA Yes Water level check 19:34
19:29 CDS Tony., Jonathan, Ryan S, Dave FCES N CDS Work 20:37
19:48 CC RyanC CER N Handheld DM checks 19:51
20:21 VAC Janos LVEA Yes Tool Pickup 20:28
20:29 SUS Jim EX N BRS Centering 21:14
20:38 CDS Tony, Jonathan, Dave EY, MY N CDS Work 22:40
21:01 EE Marc, Jabari MY N Parts 22:00
21:07 VAC Jordan, Gerardo, Janos, Travis FCES N HAM8 Vent 22:19
22:08 CDS Ryan S, Fil EY N CDS Work 22:08
22:20 EE Fil FCES N Cable Repair 23:16
22:25 VAC Janos, Gerardo LVEA Yes Tubopump/Vacuum Stuff 00:04
22:42 CDS Tony, Jonathan, Dave Mechanical Room N CDS Work 23:42
23:12 FARO Ryan C LVEA Yes Faro prep for tomorrow 23:22
23:17 EE Fil LVEA Yes Terminating Beckhoff network cables 00:17
23:23 TCS Ibrahim Mech Room N Check TCS chillers 23:52
Comments related to this report
jonathan.hanks@LIGO.ORG - 09:10, Wednesday 21 February 2024 (75910)
The issue we had with sw-mech-aux appears to be an issue with the fiber.  The fiber run is not capable of reliably running 10G at its current distance.  I replaced the link with a 1G link and it appears to be stable with the new switch.
H1 TCS (TCS)
ibrahim.abouelfettouh@LIGO.ORG - posted 15:58, Tuesday 20 February 2024 (75898)
TCS Chiller Water Level Top-Off BiWeekly FAMIS 26168

TCS Chiller Water Level Top-Off BiWeekly - Closes FAMIS 26168

Neither chiller was under its threshold min

TCS Y - Added ~300ml

TCS X - Added ~150ml

Leak Tub is dry

H1 SEI (SEI)
ibrahim.abouelfettouh@LIGO.ORG - posted 15:20, Tuesday 20 February 2024 (75897)
H1 ISI CPS Sensor Noise Spectra Check - Weekly FAMIS 25979

Closes Weekly FAMIS Task 25979

ETMX_ST1_CPSINF_V2 BSC High Freq noise is elevated.

Non-image files attached to this report
H1 PSL
ryan.short@LIGO.ORG - posted 14:27, Tuesday 20 February 2024 (75896)
PSL 10-Day Trends

FAMIS 20016

PMC reflected power has continued to increase while transmitted power has been decreasing.

Images attached to this report
H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 12:13, Tuesday 20 February 2024 (75895)
OPS DAY Midshift Update

LVEA is STILL in LASER HAZARD

Primary Ongoing Activities

  1. CDS Work is done in EX, MX and is planning to begin FCES after lunch
    1. Initial plan was EY/MY after lunch but re-coordinated to FCES.
  2. HAM8 pump is ongoing
  3. SQZT work is ongoing

Control Room Log (02/20) so far..

H1 SQZ
camilla.compton@LIGO.ORG - posted 11:52, Tuesday 20 February 2024 (75894)
SQZT8 Moved away from HAM8 for door removal

WP11693 Vicky, Camilla, Chris. 

In preparation for the for HAM8 +Y door removal, after HAM8 was been vented, we put guillotine in the viewport and removed the bellows between HAM8 and SQZT8. Bellows is wrapped in foil on top of SQZT8. We rolled SQZT8 enclosure out of the way of the door crew (it's position was already marked and parts on table secured 75831, 75829).

LHO VE
david.barker@LIGO.ORG - posted 08:13, Tuesday 20 February 2024 (75893)
Tue CP1 Fill, special time

Tue Feb 20 08:10:02 2024 INFO: Fill completed in 9min 58secs

Jordan confired a good fill curbside. Note this fill ran at 8am today before the CDS network upgrade work commenced.

Images attached to this report
H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 08:04, Tuesday 20 February 2024 (75892)
OPS Day Shift Start

TITLE: 02/20 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 5mph Gusts, 4mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.37 μm/s
QUICK SUMMARY:

H1 CDS (CDS)
erik.vonreis@LIGO.ORG - posted 07:04, Tuesday 20 February 2024 (75891)
Workstations updated

Control room workstations were updated and rebooted.  Operating system packages and conda packages were updated.

In conda, ndscope was updated to 0.19.1, with numerous improvements.

Diaggui was updated to 4.0.4, which fixes a crash when loading certain xml files.

H1 CDS
david.barker@LIGO.ORG - posted 15:55, Monday 19 February 2024 - last comment - 19:51, Monday 19 February 2024(75887)
Beckhoff slow controls system is currently down, invalid alarms have been bypassed

Daniel, Dave:

h1ecatc1, the Beckhoff slow controls system, crashed at 15:38 this afternoon. The EDC is showing 35365 disconnected channels. The computer is completely unresponsive, including its management port. It will need a manual reset.

The alarms system restarted itself at this time. The ongoing HAM6 alarms remain bypassed, and in addition I have bypassed some invalid temperatures channels

Bypass will expire:
Tue Feb 20 03:49:26 AM PST 2024
For channel(s):
    H0:VAC-LX_Y0_PT110_MOD1_PRESS_TORR
    H0:VAC-LY_Y1_PT120B_PRESS_TORR
    H1:PEM-C_CER_RACK1_TEMPERATURE
    H1:PEM-C_MSR_RACK1_TEMPERATURE
    H1:PEM-C_MSR_RACK2_TEMPERATURE
    H1:PEM-C_SUP_RACK1_TEMPERATURE
 

Comments related to this report
daniel.sigg@LIGO.ORG - 19:51, Monday 19 February 2024 (75889)

Updated to the most recent svn, and restarted.

H1 CDS
david.barker@LIGO.ORG - posted 11:08, Monday 19 February 2024 (75886)
TW1 offload raw minute trend files completed

WP11702

The file copy completed at 12:23 Sun 18th Feb. This morning I reconfigured NDS1 daqd to serve the past 6 months of data from the permanent archive area, daqd was restarted at 08:44 this morning.

The old files were then deleted from TW1's SSD-RAID between 08:53 and 10:54, taking 2hours 1min.

LHO VE
david.barker@LIGO.ORG - posted 10:17, Monday 19 February 2024 (75885)
Mon CP1 Fill

Mon Feb 19 10:11:56 2024 INFO: Fill completed in 11min 52secs

Start time has been changed to 08:00 for tomorrow's early fill prior to CDS network upgrades.

Images attached to this report
LHO VE
david.barker@LIGO.ORG - posted 10:20, Sunday 18 February 2024 (75884)
Sun CP1 Fill

Sun Feb 18 10:10:41 2024 INFO: Fill completed in 10min 37secs

Images attached to this report
LHO VE
david.barker@LIGO.ORG - posted 10:23, Saturday 17 February 2024 (75882)
Sat CP1 Fill

Sat Feb 17 10:10:46 2024 INFO: Fill completed in 10min 42secs

Images attached to this report
H1 CDS
david.barker@LIGO.ORG - posted 10:21, Saturday 17 February 2024 - last comment - 13:27, Saturday 17 February 2024(75881)
Start process of raw minute trend offload from DAQ TW1

WP11702 TW1 offload

I've started the process of offloading the past 6 months of raw minute trends from TW1's SSD-RAID to h1ldasgw1's permanent storage.

The first step was to freeze the almost full directory and switch TW1 over to writing to a new empty area, and then temporarily configuring NDS1 to serve data from the frozen dir while the file copy is in progress.

To this end, NDS1 daqd was restarted at 10:14 PST this morning.

Comments related to this report
david.barker@LIGO.ORG - 13:27, Saturday 17 February 2024 (75883)

as of 13:23 copy is 9.3% complete, ETA 11:39 Sunday morning.

LHO VE
janos.csizmazia@LIGO.ORG - posted 21:09, Friday 16 February 2024 (75880)
2-16 vent vacuum diary
Today's activities:
- HAM7 pumpdown status: ~3.3E-6 Torr
- Corner pumpdown status: ~3.9E-1 Torr. On Tuesday, transitioning to Turbo (Y-manifold; OMC; HAM6)
- EX pumpdown status: 3.75E-8 Torr: the post-vent RGA scan is ready, the results will be in the comment comment section, once they are published. The comparison with past RGAs is also coming next week. If the results will be considered satisfactory, the Ion-pump will be valved in. The GV will remain closed during FAC works
- The purge air supply at FCES is switched on, in order to start HAM8 vent first thing next week
H1 SQZ
naoki.aritomi@LIGO.ORG - posted 19:28, Friday 16 February 2024 - last comment - 23:10, Monday 19 February 2024(75879)
PMC is locked with p polarization

Naoki, Nutsinee, Daniel

We installed all the optics for PMC and locked the PMC with p-polarization. We will lock the PMC with s-polarization and align SHG, CLF, seed next week.

First we put a HWP before PMC and changed the beam to the p polarization since the p-pol has much lower finesse in PMC and it is easy to align. The HWP angle is 152 for p-pol and 108 for s-pol. 

We aligned two steering mirrors before PMC. Fig. 1 and 2 show the PMC trans (blue) and refl (red) with PMC scan. The mode matching is 93% and the refl dip reaches 88% from the maximum.

We found that the label of the pick off mirror before PMC REFL PD says R=5% for s-pol, but it was actually R=90% for s-pol and R=70% for p-pol. The PMC REFL power is ~30mW and more than 20mW was injected to PMC REFL PD, which is a lot. So we replaced this mirror with the mirror which is R=8% for s-pol and R=1% for p-pol.

Then we adjusted the demod phase of PMC PDH signal and locked the PMC with p-pol. The UGF is 1.3 kHz and phase margin is 67 deg as shown in Fig. 3. We accepted the SDF related to PMC as shown in Fig. 4. 

Note that we will have 20 times more optical gain with s-pol because of higher finesse. Also we will have 8 times more power at PMC REFL PD with s-pol because of the pick off mirror. So we need to reduce the gain by 160 with s-pol to have the same UGF as p-pol.

Images attached to this report
Comments related to this report
nutsinee.kijbunchoo@LIGO.ORG - 17:50, Monday 19 February 2024 (75888)

After the pick-off mirror swap with 34mW input we have ~2mW hitting the PMC Refl. DC readout reads 75mW. The HWP before the PMC is set to s-pol at the moment.

Attached an updated picture of the SQZT0 table. All the optics are in.

Images attached to this comment
daniel.sigg@LIGO.ORG - 23:10, Monday 19 February 2024 (75890)

The PMC PZT trigger has the PMC TRANS PD wired to channel 1 and PMC REFL to channel 2.

The DC readback of PMC_REFL is saturating and the gain adjust is broken due to a missing ground wire in the controls of aux concentrator 11 (which pegs the adjustable gain to 40dB).

Nevertheless, we were able to engage the guaduan to lock the PMC using the dip in reflection.