Dan, Koji
This afternoon we completed the final remaining jobs before the doors go on HAM6:
/ligo/svncomon/SusSVN/sus/trunk/HTTS/H1/OM1/SAGM1/Results
and equivalent. The scripts in /ligo/svncommon/SusSVN/sus/trunk/HTTS/Common/MatlabTools
have been updated to include the filenames of the latest measurements, but nothing has been committed to the SUS SVN. Will do this tomorrow.Since we locked and unlocked the ISI, the seismic team may want to make a quick check in the morning that the table is floating freely. (It's ok to turn up the purge air to keep the door covers from contacting the table.)
In the attached 'H1HTTS_ALL_Spectra' files, note that the difference between the July 18th measurements and today is the floating of the ISI. Not sure if this accounts for the change in the spectrum (more noise below 2-3Hz, less noise above).