Reports until 13:50, Friday 30 January 2015
LHO General
gary.traylor@LIGO.ORG - posted 13:50, Friday 30 January 2015 (16375)
ISS Array Work
ISS arrays are ready to be containerized. The bases for the cans needed a slight modification so they are currently at a machine shop. Once they are back and out of the air bake, work can continue for storage and shipping. I have attached a brief report with pictures for the next soul that works on this so things can be located easily.

Also attached is a spreadsheet of which items are associated with which ISS and a report of progress.
Non-image files attached to this report