H1 IOO
chris.mueller@LIGO.ORG - posted 20:21, Tuesday 12 March 2013 - last comment - 20:34, Tuesday 12 March 2013(5771)
Input Optics Work
[Rodica M., Deepak K., Chris M.]

Today we resolved the issue with IM3 which turned out to be an earthquake stop rubbing.  It isn't clear how this became an issue after pumping down, perhaps it slipped in over time.  See the attached transfer functions for an idea of the badness and subsequent goodness.  

After we were allowed to turn on the laser we double checked the centering on the IMC mirrors which seems very good to us.  We added an iris at MC2 to double check the 'by eye' centering which was done at the end of last week, and the beam looked very good.  We also installed the MC2 scraper baffle.  

Tomorrow we will check the alignment of the components downstream of the IMC.  Afterwards we will align the MC refl beam onto the trans beam path and use it to align the auxiliary paths and measure mirror transmissivities.
Non-image files attached to this report
Comments related to this report
deepakmanoj.nandakumar@LIGO.ORG - 20:34, Tuesday 12 March 2013 (5772)

The Dog clamps installed on the MC2 Scraper Baffle are 

  • D1100640-V2 Type 03 - S.N. 009.
  • D1100640-V2 Type 03 - S.N. 010.
  • D1100640-V2 Type 03 - S.N. 011.
  • D1100640-V2 Type 03 - S.N. 012.