The last few days we have tried to do some common and differential (annular) CO2 steps. As the intereferometer did not like the annular CO2 being switched off the other day we didn't try and central heating. Attached are a lot of plots showing the demodulated AWG_LINES - LSC, frequency, and jitter into OMC DCPD and the DRMI LSC IN_DQ channels.
We first reduced ITMX CO2 4->1.7W to match ITMY. From there we tried a differential and common steps in CO2 power. The differential test lost lock half way so it is split in two. The common test happened over one lock.
To summarise:
Here are some plots showing the same demodulations into CHARD yaw and pitch. Given we are seeing some strange behaviour in CHARD yaw offsets and noise increases I was wondering how these couplings might be changing. Note that the jitter lines are injected into H1:IMC-PZT_YAW_EXC so these plots show input yaw jitter to CHARD pitch for some plots.
Given that there are some reasonably large yaw misalignments between the CO2 and IFO beam (68342), how the the noise couplings with CHARD YAW are changing above, and that CHARD YAW gets noisier as the IFO thermalises (68116)) I'm wondering if centering them better might help.
Camilla reminded me of this log post about suspicious misalignments in the CO2 from awhile back as well 66500