Reports until 07:38, Wednesday 27 October 2010
LHO FMCS
john.worden@LIGO.ORG - posted 07:38, Wednesday 27 October 2010 (260)
LVEA HVAC Heaters
I have turned off two stages of heat in the LVEA. With lights and cleanrooms operating we should be able to get by without these.
X1 SEI
jeffrey.garcia@LIGO.ORG - posted 19:52, Tuesday 26 October 2010 (259)
SEI SVN checkout location updated
The seismic SVN repository has been moved to Kerberos access control, with the new location being: https://svn.ligo.caltech.edu/svn/seismic.  (The previous site was https://svn-private.ligo.caltech.edu/repositories/seismic)

Instead of wiping away the old directory and checking out the entire new one, I simply switched the site the SVN uses to update its local copy.  I switched the site for the LHO CDS "controls" account (in the control room) and the X1 SEI Workstation copies.

On the X1 SEI workstation, the repository local path is still the same:
'/opt/svncommon/seisvn/seismic/HAM-ISI/'

And in the Control Room, the "controls" user copy is still located at:
'/hanford2/users/controls/isi_local_files/SVN/seismic/HAM-ISI/'

New user names and passwords are the LIGO.ORG ones.  

On the workstation, here's the command I entered to switch the checkout site:

>> svn switch --relocate https://svn-private.ligo.caltech.edu/repositories/seismic/HAM-ISI/ https://svn.ligo.caltech.edu/svn/seismic/HAM-ISI/ --username jeffrey.garcia@LIGO.ORG

*entered in the '~/seismic/HAM-ISI/' directory.
 
LHO FMCS
kyle.ryan@LIGO.ORG - posted 19:20, Tuesday 26 October 2010 - last comment - 07:41, Wednesday 27 October 2010(258)
BSC1, HAM2, HAM3 doors
Kyle, Ski - removed BSC1 south door.  Rehung a few hours later.  

Kyle - Removed all but (4) door bolts from HAM2 and HAM3 East doors (Note-dropped large wrench from top of HAM3 and it hit cross beam)
Comments related to this report
john.worden@LIGO.ORG - 07:41, Wednesday 27 October 2010 (261)
Note to Operators regarding door removals: Whenever a BSC or HAM chamber is prepped for door removal you will see annulus ion pump alarms. These may remain in alarm for the duration of the vent. Ask Kyle or John for more info if needed.
H2 INS
keita.kawabe@LIGO.ORG - posted 18:06, Tuesday 26 October 2010 (257)
ISC table deinstall continues. ISCT10 access system "offline".
We moved to ISCT10.

One particularly dirty lens that was just sitting on top of a small aluminum table  OUTSIDE of ISCT10 enclosure along with viewers and such (not used for anything, but who'd put a lens OUTSIDE of the table enclosure?) was thrown away. Finger print and scratches all over.

At some stage all the lights of the card reader went out. This was found by me later when I tried to swipe out of ISCT10, I called the control room, and Jonathan Berliner found that ISCT10 was "offline", whatever that means. 

LSO (Dani) reset my card so I was able to continue working, but ISCT10 is still "offline". Did somebody cut off the power to the access system for this table?
H2 General
jonathan.berliner@LIGO.ORG - posted 17:42, Tuesday 26 October 2010 (256)
Last Ops Log
Pacific Daylight Time:
1227 - Done at BSC1,2,3
1234 - Cheryl returns to BSC2 with Patrick for ~15 minutes of checks 
1248 - EY cryopump alarms
1254 - Illuminator lights turned off via MEDM, power supply in LVEA left on
1317 - Dale out to H1 PSL to position camera for LaserFest recording
1330 - Gerardo out to LVEA to talk to Filiberto
1342 - Door Forced at EX (card APB, i addressed it) and at LVEA
1345 - DEA reports ISCT7 done
1347 - Gerardo out
1352 - Dale reports loud noise in LVEA due to microphone feedback from speaker.  He is also concerned for people who may complain about RF interference with other people's work.
1436 - Jodi and Kyle moving engine hoist from EX to MY
1445 - Betsy goes out to HAM1-3 to prepare cleanrooms for door removal
1511 - Corey opens Large Equipment Access Door.
1520 - Patrick out to LVEA to find Cheryl
1528 - Michael Rodruck back to LVEA for more measurements.
1609 - Jodi ook Optics Cart, straddle lift, and CP Stat foil dispenser from LVEA to MY, and is now back
1610 - Apollo guys finish replacing beam tube curtains...will commence crane-cleaning at 7:30am.

Addenda:
- I tried following up with as many Door Forced alarms as possible, but was successful less than 10% of the time in reaching the culprits by phone.  They will not be recorded in my future logs.  Currently, WAPAC reads Off-line for LVEA, but people report that it works.
- Ignore all ion pump alarms.

X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 16:36, Tuesday 26 October 2010 (255)
Quad 2 OSEM Testing
Mark Barton and I are continuing testing of Quad 2 and developing the testing procedures. Tests look good for main chain. However, there are some issues with the reaction chain, which we will continue working on tomorrow. 
H2 INS
filiberto.clara@LIGO.ORG - posted 15:52, Tuesday 26 October 2010 (254)
Uninstall of H2 Electronics continues
Removal of H2 Electronics from LVEA continues.
Images attached to this report
Logbook Admin Feature Requests
jonathan.berliner@LIGO.ORG - posted 14:41, Tuesday 26 October 2010 - last comment - 14:45, Tuesday 26 October 2010(251)
Option to show 20,50,100, etc. Entries Per Page
Just saying.
Comments related to this report
jonathan.berliner@LIGO.ORG - 14:44, Tuesday 26 October 2010 (252)
and to make the details field optional.
jonathan.berliner@LIGO.ORG - 14:45, Tuesday 26 October 2010 (253)
[no details]
H2 INS
cheryl.vorvick@LIGO.ORG - posted 14:15, Tuesday 26 October 2010 (250)
H1 BSC1,2,3 Optics Lockdown
Locked down ITMX, ITMY, and BS.  ITMX and ITMY have eLigo glass earthquake (EQ) stops - BS has iLigo viton EQ stops.

On ITMs I used the four EQ stops on the face of the optic to push it onto the back EQ stops, securing it without having to remove the elliptical baffle, or working near OSEMs.  On the BS, I used EQ stops on both sides to secure the optic.

Both ITMs:
All EQ stops showed some evidence of martial removal where the EQ stops contact the optic chamfer.

ITMY: 
When looking at the face of the optic, the Lower Right EQ stop seemed to be very close to the optic.  It's very possible that the venting of the chamber shifted the optic position, so it's unclear if this was the situation under vacuum.

ITMX:
When working with Patrick I turned one EQ stop (LR when looking at the otic face) too far and slightly ground the glass, which could be heard, effectively showing him what not to do.

Contamination:
Evidence of particulate in all BSCs, and HAM3.
H2 INS
dani.atkinson@LIGO.ORG - posted 13:56, Tuesday 26 October 2010 (249)
ISCT7 Cleared
Dani and Keita

ISCT7 has been cleared of all optics and other components, excepting the large PDs (which Richard will take), the accelerometers (needs plugs pulled), and a rotation stage (needs plugs pulled).
H2 General
jonathan.berliner@LIGO.ORG - posted 12:04, Tuesday 26 October 2010 (248)
Oct 26 2010 Ops Mid-Shift Log
Times in Pacific Daylight Time:
0908 - Input violation at LVEA roll-up door
0912 - Diamond Freight for Betsy Bland
0916 - Door Forced at MY
0922 - UniFirst
0928 - Dave Barker begins pulling H1 channels
0931 - Jodi to HAM6 to retrieve curtain
0942 - Sprague
0943 - Mike Landry out for 5 minutes to LVEA with Jodi
0956 - Eric takes truck over X-arm bridge to other side of LVEA to HAM12 side, cleans up vacuum equipment
0958 - 4k SUS MC watchdogs start beeping off
1004 - Cover Open West Emergency Exit Doors
1011 - HVE LY pump alarm
1016 - Gerardo unloads stuff at MY
1021 - Sprague returns
1022 - American Crossroads calls Control Room (again)...we should get off of their list.
1024 - Jodi will open roll-up door by high bay
1038 - Corey and Eric A. cleaning up by HAM12
1044 - Betsy goes to BSC1
1054 - Door Forced X-End
1110 - Rick out to LVEA for LaserFest rehearsal
1112 - Door Forced X-End
1110 - Illuminator lights turned on in BSC1,2,3.  Turn on power supply in VEA and then use MEDM H0VIDEO_ILLUM.
1114 - Cover Open West Emergency End
1128 - Sprague is back
1137 - Gerardo is official runner for BSC1
1140 - Praxair delivery
1145 - Eric done at HAM12, Corey still taping up roughed up concrete.
1159 - Rodruck out to LVEA for PSL work
1150 - Corey declares HAM12 done
1201 - KingAir here to work on RO
H2 General
jonathan.berliner@LIGO.ORG - posted 09:25, Tuesday 26 October 2010 (247)
Many Open Work Permits
(Reminder for myself and relevant persons)

#2582 - De-install H2 EY LOS (Doug Cook)
#2584 - LaserFest at H1PSL (Dale Ingram)
#2583 - ISCT7 Decommissioning (Keita Kawabe)
#2581 - Close GV1,2 Vent Vertex (Kyle Ryan)
#2580 - Close GV10,11 Crane Scissor lift over VE to North side of LVEA (Kyle, Ski)
#2577 - Turn on LVEA clean rooms (Cheryl Vorvick)
#2576 - Soft-close GV5,7 (John)
#2579 - Remove H2 EY Transmission Monitor (Gerardo Moreno)
#2573 - Drill Holes for HAM12 (Corey Gray)
#2574 - De-install H2 TCS (Cheryl)
#2571 - Remove H2 electronics (Richard McCarthy)
#1793 - Install temp. patch finders at MX (McCarthy)
#2563 - Characterize optical losses in IMC (Rick Savage)
#2566 - Remove all H2 channels from frame (Dave Barker)
#2553 - Remove VME cards from H2 (McCarthy)
#2530 - Installl infrasound mic at EX (Robert Schofield)
#2524 - PSL table leg experiments (Rick)
#2500 - PSL table leg experiments (Rick)
#2304 - Install fb1c (Dave)

When complete, please sign your permit out.
H2 General
corey.gray@LIGO.ORG - posted 21:28, Monday 25 October 2010 (246)
HAM12 SEI Pier Anchor Holes & Floor Roughing Complete
(Eric A., Corey G.)
After the BSC1 cleanroom was engaged we were given the go-ahead to finish the dirty job of roughing the concrete for the HAM12 Piers.  This work was completed around 5:30 (well, almost complete:  I cleaned up most of our mess, but there are quite a few items we need to put away---will leave this for tomorrow).  The floor around HAM12 was sweeped and then wet-mopped.  We also utilized a HEPA fan to help keep our mess to a minimum, and this worked out great (thanks Rick & Eric!).  I will close out our work permit tomorrow when our mess is cleaned up.
H2 INS
patrick.thomas@LIGO.ORG - posted 18:01, Monday 25 October 2010 (242)
Ops Day Summary
Richard and Filiberto started pulling the H2 electronics from the LVEA.

H0:FMC-MX_CY_H2O_PUMPSTAT is failed. See Ski's elog
Sno Valley came to look at the part numbers for the pump.

Keita and Dani started pulling optics from ISCT7.

Rick rigged up a HEPA filter near HAM12 to pull in the dust from the scouring.
Corey and Eric finished the prepping work for the HAM12 pier anchor bolts.

Kyle closed GV1, GV2, GV10 & GV11, started venting the vertex and HAM6.

Gerardo removed the H2-ETMY transmission monitor.

Jodi and Ski prepped for the BSC1 vent and worked on the clean room at mid Y.

Apollo cleaned at Y end.

Cyrus turned tidal off.

John Zweizig started migrating the DMT viewers to the advanced ligo configuration.

Dave removed the disconnect channels from the EDCU.

Reboldt worked at the LSB.
H2 INS
keita.kawabe@LIGO.ORG - posted 17:58, Monday 25 October 2010 (245)
ISC deinstall starts
Started pulling optics etc. from ISC 7.

General purpose mounts, beam dumps etc. are restocked in the optics lab cabinets. 

Most of labeled optics are put in boxes and stored in ISC cabinets, some are returned to the optics lab.

The work will continue several days more.
LHO FMCS
kyle.ryan@LIGO.ORG - posted 17:46, Monday 25 October 2010 (244)
Vertex vent activities and Y-mid gate valves
Closed GV10 and GV11 (Ski et al. craning scissor lift over VE).  Note GV11 "clanked" atypically when gate cammed closed.  



Started CS purge air compressor*Closed GV1 and GV2*Started Vertex, XBM and YBM QDP80s and Main turbo pumps*Vented Vertex and HAM6 volumes simultaneously (note: new requirement to maintain <0.5 atm pressure difference across HAM6 septum as the result of design flaw awarness-see Mike Z., Dennis C., John W., Albert L.)*Isolated BSC1 annulus ion pump*removed all but (4) door bolts from BSC1 South door
H2 DAQ
gregory.mendell@LIGO.ORG - posted 17:39, Monday 25 October 2010 (243)
DCS (LDAS) transition to A6 (After S6) archiving of DAQ (CDS) data
DCS (LDAS) transitioned to A6 (meaning "After S6") on Oct. 20, 2010, shortly after 8 am local time. During this time period all raw (L0) data at LHO and LLO is being copied to the site LDAS archives, and also is being transferred to the CIT LDAS archive, whenever this data is available from any of the DAQ (CDS) framewriters. The same holds for second-trend and minute-trend data. We continue to rsync any new DMT data, whenever it is available, but no LDAS RDS data is being generated during this time period.

Note that the raw (L0) data will soon be pared down to mostly PEM data, and there will be no interferometer data until squeezing data and aLIGO test data begins to be written to the raw frames. 

Thus, if you are looking for data "After S6" outside of the control room, ask about A6 data.
X1 SUS
jeffrey.bartlett@LIGO.ORG - posted 16:28, Monday 25 October 2010 (241)
Top Mass Magnets and Sgns
Reset all Top Mass flag magnets on Quad-2 to conform to Derek’s document E1000617. Set the Gains in MEDM to conform to Mark’s document E1000494. Ran Actuator Sign Test and all responses were positive. 

Main Chain 
FACE1	N	-1
FACE2	S	 1
FACE3	N	-1
LEFT	S	 1
RIGHT	N	-1
SIDE	N	-1

Reaction Chain      
FACE1	N	 ?  No apparent actuation
FACE2	N	-1
FACE3	S	 1
LEFT	N	-1
RIGHT	S	 1
SIDE	N	-1