Kyle, Gerardo 0900 hrs. local Added 1.5" O-ring valve in series with existing 1.5" metal valve at Y-end RGA pump port -> Valved-in pump cart to RGA -> Valved-in Nitrogen calibration bottle into RGA -> Energized RGA filament -> Valved-out and removed pump cart from RGA -> Valved-in RGA to Y-end ???? hrs. local Began faraday analog continuous scan of Y-end 1140 hrs. local Isolated NEG pump from Y-end -> Began NEG pump regeneration (30 min. ramp up to 250C, 90 min. soak, stop heat and let cool to 150C) 1410 hrs. local Valved-in NEG pump to Y-end 1430 hrs. local Valved-out Nitrogen cal-gas from Y-end 1440 hrs. local Valved-in Nitrogen to Y-end -> Stop scanning
Plot of pressure at Y-End station before, during and afer NEG regeneration.
Response of PTs along the Y-arm to NEG pump regeneration.
Rai,
That is on our list of things to do - make a table of the relevant amus' partial pressures.
Note that all the ascii data is at:
caution - 15 mbytes
Kyle can probably fish out the relevant data from the RGA computer so no need to plow through the whole file.
thanks for the comments, Mike and Rai.